Please use this identifier to cite or link to this item:
http://repositorio.lnec.pt:8080/jspui/handle/123456789/1007158
Title: | Daivões dam spillway: a novel solution for the stilling basin |
Authors: | Alves, E. Hernando, F. Chacon, R. |
Keywords: | Spillway;Stilling basin;Dentate weir;Physical model |
Issue Date: | Apr-2015 |
Abstract: | The Upper Tâmega Hydroelectric Project is located in the Tâmega River, a tributary of Douro River, and includes, among other elements, the construction of three dams: Alto Tâmega, Daivões and Gouvães. Daivões Dam is a concrete arch gravity structure, 77 m high above foundation, with a gated controlled spillway, located in the center of the dam, and followed by stilling basin controlled by a tall end weir to force the hydraulic jump in a shorter distance. The hydraulic performance of the proposed spillway stilling basin was tested and optimized on a physical model at 1:50 scale. The paper presents the results of the physical models study and the final unconventional solution adopted for the spillway stilling basin. |
URI: | https://repositorio.lnec.pt/jspui/handle/123456789/1007158 |
Appears in Collections: | DHA/NRE - Comunicações a congressos e artigos de revista |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Daivoes dam spillway_EA.pdf | 1.54 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.