Please use this identifier to cite or link to this item: http://repositorio.lnec.pt:8080/jspui/handle/123456789/1007158
Full metadata record
DC FieldValueLanguage
dc.contributor.authorAlves, E.pt_BR
dc.contributor.authorHernando, F.pt_BR
dc.contributor.authorChacon, R.pt_BR
dc.date.accessioned2015-05-07T09:31:51Zpt_BR
dc.date.accessioned2017-04-12T16:10:50Z-
dc.date.available2015-05-07T09:31:51Zpt_BR
dc.date.available2017-04-12T16:10:50Z-
dc.date.issued2015-04pt_BR
dc.identifier.urihttps://repositorio.lnec.pt/jspui/handle/123456789/1007158-
dc.description.abstractThe Upper Tâmega Hydroelectric Project is located in the Tâmega River, a tributary of Douro River, and includes, among other elements, the construction of three dams: Alto Tâmega, Daivões and Gouvães. Daivões Dam is a concrete arch gravity structure, 77 m high above foundation, with a gated controlled spillway, located in the center of the dam, and followed by stilling basin controlled by a tall end weir to force the hydraulic jump in a shorter distance. The hydraulic performance of the proposed spillway stilling basin was tested and optimized on a physical model at 1:50 scale. The paper presents the results of the physical models study and the final unconventional solution adopted for the spillway stilling basin.pt_BR
dc.language.isoengpt_BR
dc.rightsopenAccesspt_BR
dc.subjectSpillwaypt_BR
dc.subjectStilling basinpt_BR
dc.subjectDentate weirpt_BR
dc.subjectPhysical modelpt_BR
dc.titleDaivões dam spillway: a novel solution for the stilling basinpt_BR
dc.typeconferenceObjectpt_BR
dc.description.pages01-10pppt_BR
dc.identifier.localLNEC, Lisboapt_BR
dc.description.sectorDHA/NREpt_BR
dc.identifier.conftitleSecond International DAM WORLD Conferencept_BR
Appears in Collections:DHA/NRE - Comunicações a congressos e artigos de revista

Files in This Item:
File Description SizeFormat 
Daivoes dam spillway_EA.pdf1.54 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.