Please use this identifier to cite or link to this item:
http://repositorio.lnec.pt:8080/jspui/handle/123456789/1012544
Title: | Report on PAC testing at full scale in FNW WWTP |
Other Titles: | Technical report of Action B7.2 “Full-scale demo in case study II: Chemical enhancement measures |
Authors: | Campinas, M. Viegas, R.M. C. Silva, C. Gomes, A. Rosa, M. J. |
Keywords: | LIFE Impetus;Wastewater treatment;Faro NW;WWTP;Secondary treatment;PAC testing;Activated carbon;Full scale;Biological reactor;Pharmaceutical compounds;Energy;Efficiency |
Issue Date: | Nov-2019 |
Abstract: | This document constitutes a Technical report of Action B7.2 “Full-scale demo in case study II: Chemical enhancement measures “ of the project LIFE Impetus - Improving current barriers for controlling pharmaceutical compounds in urban wastewater treatment plants (LIFE14 ENV/PT/000739). This report summarizes the activities developed in action B7.2 and addresses two full scale tests of powdered activated carbon (PAC) addition to the biological reactor of the FNW wastewater treatment plant for controlling the targeted pharmaceutical compounds (PhCs). The document includes chapters with tests planning, description, results and discussion. |
URI: | https://repositorio.lnec.pt/jspui/handle/123456789/1012544 |
Appears in Collections: | DHA/NES - Relatórios Científicos |
Files in This Item:
There are no files associated with this item.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.