Please use this identifier to cite or link to this item: http://repositorio.lnec.pt:8080/jspui/handle/123456789/1017683
Full metadata record
DC FieldValueLanguage
dc.contributor.authorPereira, R.pt_BR
dc.contributor.authorBatista, A. L.pt_BR
dc.contributor.authorNeves, L.pt_BR
dc.date.accessioned2024-09-23T15:33:22Zpt_BR
dc.date.accessioned2024-10-07T15:28:45Z-
dc.date.available2024-09-23T15:33:22Zpt_BR
dc.date.available2024-10-07T15:28:45Z-
dc.date.issued2018pt_BR
dc.identifier.citation10.1007/s11269-018-1973-xpt_BR
dc.identifier.urihttp://repositorio.lnec.pt:8080/jspui/handle/123456789/1017683-
dc.description.abstractThe dam’s reservoir water level varies over the year according to the water inflow and outflow, as a function of environmental events but also of dam exploitation management policy and human decisions. In the Portuguese dam safety regulation (RSB 2007), the normal water level (NWL) is considered as the optimum exploitation level. However, as proved by the continuous monitoring over the lifetime of a set of dams, the NWL is occasionally exceeded for non-negligible time periods. The reservoir water level, to which the water pressure on the upstream face is related, is a fundamental parameter for the safety and reliability analysis of concrete dams. When water-induced actions are considering the leading loads, only the maximum reservoir water level, usually associated with a high-return-period flood, is relevant. However, for other combinations, in particular, earthquake scenarios, the consideration of the variability of the water level over time is crucial. In reliability analysis of concrete dams, the reservoir water level has been considered either as a deterministic variable, once the loading scenario analyzed assume water-induced actions as leading loads (Westberg 2010), or as a random variable defined using hydrological site information of a specific study case (Altarejos et al. Structural Safety 36-37:1–13 2012). This work proposes a probabilistic model of the reservoir water level of any new dam based only on its geometrical properties, which provides a low-cost alternative to in-depth hydrological analysis. The proposed model can be useful in two stages of the lifecycle of dams: (i) initial design and feasibility stages, and (ii) routine safety assessment of existing structures, as in both stages the costs of a complete hydrological analysis is too high for the level of detail required. For that, the recorded reservoir water level of 27 Portuguese large concrete dams is used. A normalized sinusoidal model, with annual period, is adjusted to the reservoir water level annual history of those dams by beta regression. Generally, a good agreement between observations and the proposed model, for most of the annual adjustments, was achieved. The distribution parameters of the random variables were estimated through the maximum likelihood estimation (MLE) method. The physical, model and statistical uncertainties were quantified and can now be included in a reliability analysis procedure.pt_BR
dc.language.isoengpt_BR
dc.publisherSpringerpt_BR
dc.relationSFRH/BD/91131/2012pt_BR
dc.rightsrestrictedAccesspt_BR
dc.subjectConcrete damspt_BR
dc.subjectReservoir water levelpt_BR
dc.subjectMonitoringpt_BR
dc.subjectUncertainty modellingpt_BR
dc.subjectReliability analysispt_BR
dc.titleProbabilistic Model for the Representation of the ReservoirWater Level of Concrete Dams During Normal Operation Periodspt_BR
dc.typeworkingPaperpt_BR
dc.description.volume32p.pt_BR
dc.description.sectorDBB/CHEFIApt_BR
dc.identifier.proc0401/1102/20366pt_BR
dc.description.magazineWater Resources Managementpt_BR
dc.contributor.peer-reviewedSIMpt_BR
dc.contributor.academicresearchersSIMpt_BR
dc.contributor.arquivoNAOpt_BR
Appears in Collections:DBB/NMMR - Comunicações a congressos e artigos de revista

Files in This Item:
There are no files associated with this item.


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.