Please use this identifier to cite or link to this item: http://repositorio.lnec.pt:8080/jspui/handle/123456789/1003935
Full metadata record
DC FieldValueLanguage
dc.contributor.authorTavares de Castro, A.pt_BR
dc.contributor.authorBatista, A. L.pt_BR
dc.contributor.authorSerra, C.pt_BR
dc.contributor.editorC. Pina, E. Portela, J. Gomespt_BR
dc.date.accessioned2012-10-18T13:56:07Zpt_BR
dc.date.accessioned2014-10-09T14:21:45Zpt_BR
dc.date.accessioned2017-04-13T11:55:49Z-
dc.date.available2012-10-18T13:56:07Zpt_BR
dc.date.available2014-10-09T14:21:45Zpt_BR
dc.date.available2017-04-13T11:55:49Z-
dc.date.issued2011-02pt_BR
dc.identifier.urihttps://repositorio.lnec.pt/jspui/handle/123456789/1003935-
dc.description.abstractThis paper presents the most relevant monitoring data and the interpretation of the structural behaviour of Alqueva dam during the first filling of the reservoir, which took place between February 2002 and January 2010. The safety control and the interpretation of the dam’s behaviour make use of the data provided by the monitoring system. In particular, the interpretation of the structural behaviour is based on: planimetric (radial and tangential) displacements, measured through plumb-line and geodetic methods; vertical displacements, measured with rod extensometers and obtained through geometric levellings; and temperatures, strains and stresses within the dam’s body, measured with embedded electrical resistance devices. A three-dimensional finite element model, considering the concrete viscoelastic behaviour and foundation specific characteristics, such as fault 22 located in the left bank, was developed for the numerical simulation of the dam structural behaviour. The time histories of the hydrostatic load and of the measured temperature within the dam’s body were considered in the model. The dam’s full-mixed concrete delayed behaviour was assumed to be represented by the Bažant and Panula’s basic creep function, evaluated from both in situ and laboratory tests. The results of a quantitative interpretation of the monitored displacements during this period, using a viscoelastic formulation, are close to those provided by the structural analysis.pt_BR
dc.language.isoengpt_BR
dc.publisher6th International Conference on Dam Engineeringpt_BR
dc.rightsopenAccesspt_BR
dc.subjectAlqueva dampt_BR
dc.subjectConcrete creeppt_BR
dc.titleAnalysis and interpretation of the structural behaviour of Alqueva dam during the first filling of the reservoirpt_BR
dc.typeconferenceObjectpt_BR
dc.identifier.localedicaoLisboapt_BR
dc.description.figures19pt_BR
dc.description.tables2pt_BR
dc.description.pages20pt_BR
dc.identifier.seminario6th International Conference on Dam Engineeringpt_BR
dc.identifier.localLisboapt_BR
dc.description.sectorDBB/NOpt_BR
dc.description.year2011pt_BR
dc.description.data15-17 Fevereiropt_BR
Appears in Collections:DBB/NO - Comunicações a congressos e artigos de revista

Files in This Item:
File Description SizeFormat 
Castro-Paper 40-Dam11.pdf1.56 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.