Browsing by Author 63

Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
or enter first few letters:  
Showing results 21 to 40 of 51 < previous   next >
Issue DateTitleAuthor(s)
Jun-2011A case study in construction optimisation for sub-ballast layerPaixão, A.; Fortunato, E.; Fontul, S.
Nov-2013Case study on the rehabilitation of an old African heavy haul freight lineFortunato, E.; Fontul, S.; Paixão, A.; Cruz, N.; Cruz, J.; Asseiceiro, F.
May-2021Conceção de redes rodoviárias em zonas de 30 km/hFerreira, J.; Vieira Gomes, S.; Fontul, S.
30-Jun-2014Evaluation of ballast fouling using GPRFontul, S.; Fortunato, E.; Chiara, F.
17-Oct-2019Future trends in transport infrastructure monitoringFontul, S.
May-2012FWD application to railway track-bed layers characterizationFontul, S.; Govind, K.; Chiara, F.; Fortunato, E.
13-Oct-2014GPR laboratory tests for railways materials dielectric properties assessmentChiara, F.; Fontul, S.; Fortunato, E.
27-Jun-2022IFC Development for BIM Application to Railway Projects.Fontul, S.; Falcão Silva, M. J.; Couto, P.
Aug-2010Improvements of Neural Networks Application for BackcalculationMartins da Cunha, D.; Fontul, S.; Lopes, M. G.
Sep-2012Improving the use of unbound granular materials in railway sub-ballast layerFortunato, E.; Paixão, A.; Fontul, S.
2013Influência da força de ensaio na avaliação estrutural de pavimentos por métodos não destrutivosMachado, A.; Fontul, S.; Freire, A. C.
Nov-2019Influência da temperatura no controlo das soldaduras de geomembranas de PVCSanfona, P.; Barroso, M. P.; Fontul, S.
Dec-2013Inspeção, manutenção e reabilitação de pavimentos - Relatório do curso realizado em São Tomé de 21 a 24 de outubro de 2013Fontul, S.; Nunes, N.
18-Apr-2012Non Destructive Tests for Evaluation of Railway Platforms: Application of Ground Penetrating RadarFontul, S.; Fortunato, E.; Chiara, F.; Paixão, A.
6-Sep-2011Non destructive tests for railway infrastructure stiffness evaluationFontul, S.; Fortunato, E.; Chiara, F.
Sep-2018Numerical analysis of geogrid contribution to railway track reinforcementLanca, A.; Dimitrovová, Z.; Barroso, M. P.; Fontul, S.
Mar-2010Optimization of high-speed railway track using bituminous sub-ballast - Progress report of project PDTC/ECM/70571/2006-2009Santos, A. F.; Fontul, S.; Fortunato, E.; Freire, A. C.
May-2018O papel das geogrelhas na estabilização da camada de balastro de infraestruturas ferroviárias: Revisão bibliográficaPires, D.; Barroso, M. P.; Fontul, S.; Dimitrovová, Z.
2014Os pavimentos rodoviários e a qualidade das escorrências de estradas num cenário de alterações climáticasBarbosa, A. E.; Freire, A. C.; Fontul, S.; Fernandes, J. N.
Jun-2018Programa de ID&I 2013-2020 do Departamento de Transportes do LNEC - Revisão Intercalar (2013-2017)Macedo, A. L.; Arsénio, E.; Batista, F. A.; Cardoso, J. L.; Fortunato, E.; Freire, A. C.; Fontul, S.; Vieira Gomes, S.; Paixão, A.; Roque, C. A.