Please use this identifier to cite or link to this item: http://repositorio.lnec.pt:8080/jspui/handle/123456789/1003958
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMarcelino, J.pt_BR
dc.contributor.authorPaixão, J. B.pt_BR
dc.date.accessioned2012-10-22T09:19:44Zpt_BR
dc.date.accessioned2014-10-10T13:39:31Zpt_BR
dc.date.accessioned2017-04-13T12:11:01Z-
dc.date.available2012-10-22T09:19:44Zpt_BR
dc.date.available2014-10-10T13:39:31Zpt_BR
dc.date.available2017-04-13T12:11:01Z-
dc.date.issued2012-10pt_BR
dc.identifier.urihttps://repositorio.lnec.pt/jspui/handle/123456789/1003958-
dc.description.abstractThe Valtorno-Mourão dam in the municipality of Vila Flor is intended to create a reservoir with the total volume of 1.12 x106 m3 for water supply. The embankment has a crest length of 150 m and 32 m of maximum height. It as a homogeneous profile including a sub-vertical filter. The construction of the dam took place between July 2004 and January 2006. During the first filling, the comparison of the results of monitoring with the predictions from the Monitoring Plan lead to the conclusion that the dam was not having the expected behaviour, both for the amount of flow, which was roughly ten times higher than it was expected, and for the pore pressures measured in some piezometers. The Tras-os-Montes region in Portugal has normally severe conditions of water supply and the amount of loss in the dam was not compatible with normal supply to the populations. Given this scenario, it was decided to stop the first filling of the reservoir to allow the diagnosis of deficiencies. As a result, a new grouting treatment of the foundation was made, so that currently, the dam exhibits the desired behaviour. This paper seeks to describe the fundamental characteristics of the dam and foundation, some aspects of the construction, the diagnosis of disabilities, the treatment performed and, finally, the behaviour observed up to the date.pt_BR
dc.language.isoengpt_BR
dc.rightsopenAccesspt_BR
dc.subjectFill dampt_BR
dc.subjectMonitoringpt_BR
dc.subjectReinforcementpt_BR
dc.subjectFirst fillingpt_BR
dc.titleValtorno-Mourão Dam. Reinforcement of the foundation grout due to problems detected during the first fillingpt_BR
dc.typeconferenceObjectpt_BR
dc.identifier.localedicaoMaceió - Alagoas - Brasilpt_BR
dc.description.figures10pt_BR
dc.description.tables4pt_BR
dc.description.pages12pt_BR
dc.identifier.seminario54 IBRACON, Conferência DAM WORLDpt_BR
dc.identifier.localMaceió, Brasilpt_BR
dc.description.sectorDG/NBOApt_BR
dc.description.year2012pt_BR
dc.description.data8-11 Outubropt_BR
Appears in Collections:DG/NGOH - Comunicações a congressos e artigos de revista

Files in This Item:
File Description SizeFormat 
54cbc1002.pdf1.92 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.