Please use this identifier to cite or link to this item:
http://repositorio.lnec.pt:8080/jspui/handle/123456789/1019025| Title: | Final report of LIFE Fitting |
| Other Titles: | Technical Report_part B |
| Authors: | Rosa, M. J. Campinas, M. Silva, C. |
| Keywords: | Micropollutants and amr removal;Wastewater treatment optimisation;Plan-do digital toolbox;Best practices and policy recommendations,;Water quality-based management |
| Issue Date: | Aug-2025 |
| Abstract: | The LIFE Fitting project (2023-2025) involved 3 partners (LNEC, TRATAVE, SA, Universidade Católica do Porto) and successfully achived its two main objectives: (i) to soundly evaluate, at full scale, operational strategies to enhance the removal of micropolluants, antimicrobial resistance (AMR) and other contaminants of emerging concem (CECs) in wastewater treatment plants (WWTPs) with activated sludge (AS) systems and ozonation and (ii) to developed the PLAN-DO toolbox for smart monitoring, operation, and strategic planning of such plants integrating 5 tools: Monitor Tool, PAStool, CEC Forecast Tool, Smart Discharge Tool, and Plan Tool. |
| URI: | http://dspace2.lnec.pt:8080/jspui/handle/123456789/1019025 http://repositorio.lnec.pt:8080/jspui/handle/123456789/1019025 |
| Appears in Collections: | DHA/NES - Relatórios Científicos |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| Final report_Technical Report_part B_LIFE Fitting_V3.pdf | Relat?rio | 2.58 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.
