Please use this identifier to cite or link to this item: http://repositorio.lnec.pt:8080/jspui/handle/123456789/1015995
Full metadata record
DC FieldValueLanguage
dc.contributor.authorFernandes , I.pt_BR
dc.contributor.authorLima, C.pt_BR
dc.contributor.authorQueralt, M.pt_BR
dc.contributor.authorCaldeira, L.pt_BR
dc.contributor.authorMiranda, L.pt_BR
dc.date.accessioned2023-02-08T11:58:02Zpt_BR
dc.date.accessioned2023-02-28T12:26:13Z-
dc.date.available2023-02-08T11:58:02Zpt_BR
dc.date.available2023-02-28T12:26:13Z-
dc.date.issued2018-01pt_BR
dc.identifier.urihttps://repositorio.lnec.pt/jspui/handle/123456789/1015995-
dc.description.abstractThe Crestuma-Lever dam, located in the North of Portugal, in the fluvio-maritime stretch of the Douro River, is the major element of the most downstream hydropower scheme in the Douro catchment. Completed in 1985, it also provides water supply to the Oporto metropolitan area and plays a key role in river navigationpt_BR
dc.language.isoengpt_BR
dc.publisherHydro 2018pt_BR
dc.rightsopenAccesspt_BR
dc.titleImplemented solutions to enhance the safety of the alluvial foundation of the Crestuma-Lever dampt_BR
dc.typeconferenceObjectpt_BR
dc.identifier.localedicaoPolóniapt_BR
dc.description.pages9ppt_BR
dc.identifier.localPolóniapt_BR
dc.description.sectorDG/NGUTpt_BR
dc.identifier.conftitleHydro 2018pt_BR
dc.contributor.peer-reviewedNAOpt_BR
dc.contributor.academicresearchersNAOpt_BR
dc.contributor.arquivoSIMpt_BR
Appears in Collections:DG/NGEA - Comunicações a congressos e artigos de revista

Files in This Item:
File Description SizeFormat 
[I5] 2018_HYDRO2018.pdf3.86 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.