Please use this identifier to cite or link to this item: http://repositorio.lnec.pt:8080/jspui/handle/123456789/1014501
Title: SEISMIC MONITORING SYSTEMS IMPLEMENTED ON RECENT PROJECTS
Authors: Monteiro, G.
Pinho, P.
Gomes, J. P.
Keywords: Dams;Safety;Portuguese Legislation;Seismic Monitoring Systems;Seismic Studies
Issue Date: Sep-2020
Publisher: LNEC
Abstract: In the last decade Portugal made a significant set of investments in new hydroelectric projects under the National Dams Program with High Hydroelectric Potential. EDP Produção SA, a company of EDP - Energias de Portugal Group, played a fundamental role in the construction of these projects, in which new dams and reservoirs of significant dimensions are integrated. According to Portuguese legislation, with relevance to the RSB-Dam Safety Regulation (Decree-Law no. 21/2018 of 28 March), the DTA-Technical Documents to Support the RSB and taking into account the seismic risk associated with the region where the dams were built, it was recommending the implementation of a set of Seismic Monitoring Systems (SMS) to characterize the seismic actions and the respective structural response, as well as the assessment of the reservoirs induced seismicity. For that, it was necessary, in the design phases, to carry out several studies to define the type of dynamic monitoring systems, especially those related to the seismic monitoring systems (SMS). In their most extensive configuration, these systems, based on triaxial accelerometers sensors, may incorporate remote stations installed along the reservoirs for studying the propagation of seismic actions. For the higher dams, and to ensure a good characterization of the dynamic behaviour, continuous dynamic monitoring system (CDMS) was also installed. This paper presents the main aspects of the legislation, refers the main studies and methodologies that were used, and the general aspects of the regional geological and tectonic framework. Also, is presented several seismic monitoring systems that were implemented by EDP, namely those related to the hydroelectric projects of Baixo Sabor, Foz Tua, Ribeiradio and Alto Ceira II dams.
URI: https://repositorio.lnec.pt/jspui/handle/123456789/1014501
Appears in Collections:DBB/NMMR - Comunicações a congressos e artigos de revista

Files in This Item:
There are no files associated with this item.


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.