Please use this identifier to cite or link to this item: http://repositorio.lnec.pt:8080/jspui/handle/123456789/1012030
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMonteiro, G.pt_BR
dc.contributor.authorNeves, J.pt_BR
dc.contributor.authorGomes, J. P.pt_BR
dc.date.accessioned2019-11-04T11:16:07Zpt_BR
dc.date.accessioned2019-12-05T10:25:52Z-
dc.date.available2019-11-04T11:16:07Zpt_BR
dc.date.available2019-12-05T10:25:52Z-
dc.date.issued2019-05pt_BR
dc.identifier.isbn978-972-49-2308-6pt_BR
dc.identifier.urihttps://repositorio.lnec.pt/jspui/handle/123456789/1012030-
dc.description.abstractThe Baixo Sabor hydroelectric scheme is located at northeast of Portugal and creates a reservoir with a storage capacity of 630 million m3 of water. The dam is a concrete double-curvature arch dam with 123 m high. According to the Portuguese legislation and considering the seismic risk of the dam construction zone, a Seismic Monitoring System (SMS) need be provided. In their most extensive configuration, these systems may incorporate remote stations along the reservoir for studying the propagation of seismic waves and to detect eventual induced reservoir seismicity. So, for the observation of the seismic activity on the surrounding area of the reservoir, to characterize the seismic action and the corresponding structural response of the dams, an observation system based on triaxial accelerometers was designed and installed. This system has been in continuous operation since its installation, and the data of the recorded earthquake records has been analyzed and processed. This article presents a brief description of the regional geological and tectonic setting including the stratigraphic and lithological unit’s description, the main geological faults, tectonic history resume, and the local geological surface characterization of the seismic exterior stations. Also, the paper describes the main features of the seismic monitoring system that was installed in the Hydropower Scheme of Baixo Sabor, constructed and owned by EDP Produção a company of EDP - Energias de Portugal Group, and presents some of the main results obtained during the first period of operation of the dam.pt_BR
dc.language.isoengpt_BR
dc.publisher3rd Meeting of EWG Dams and Earthquakespt_BR
dc.rightsrestrictedAccesspt_BR
dc.subjectDamspt_BR
dc.subjectConcretept_BR
dc.subjectSeismic hazardpt_BR
dc.subjectSafetypt_BR
dc.subjectDynamic monitoringpt_BR
dc.titleSeismic monitoring system of Baixo Sabor hydroelectric power schemept_BR
dc.typeworkingPaperpt_BR
dc.identifier.localedicaoLisboapt_BR
dc.identifier.localLisboapt_BR
dc.description.sectorDBB/NMMRpt_BR
dc.identifier.conftitle3rd Meeting of EWG Dams and Earthquakespt_BR
dc.contributor.peer-reviewedSIMpt_BR
dc.contributor.academicresearchersNAOpt_BR
dc.contributor.arquivoSIMpt_BR
Appears in Collections:DBB/NMMR - Comunicações a congressos e artigos de revista

Files in This Item:
There are no files associated with this item.


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.