Please use this identifier to cite or link to this item: http://repositorio.lnec.pt:8080/jspui/handle/123456789/1011958
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMatos , D.pt_BR
dc.contributor.authorTavares de Castro, A.pt_BR
dc.contributor.authorGomes, A.pt_BR
dc.contributor.authorFigueiredo, J.pt_BR
dc.date.accessioned2019-10-29T15:00:23Zpt_BR
dc.date.accessioned2019-12-05T10:22:37Z-
dc.date.available2019-10-29T15:00:23Zpt_BR
dc.date.available2019-12-05T10:22:37Z-
dc.date.issued2019-10pt_BR
dc.identifier.urihttps://repositorio.lnec.pt/jspui/handle/123456789/1011958-
dc.description.abstractFoz Tua project, located close to Tua river’s mouth, a tributary of Douro river (right bank), North of Portugal, is the latest accomplished hydroelectric investment of EDP - Energias de Portugal. The project includes a concrete double curvature arch dam closing a narrow granitic valley, in the right bank a twin shaft powerhouse and two independent sets of headrace and tailrace tunnels. The reservoir has a capacity of 106 Mm³ and a surface area of 420.9 ha at the normal water level (NWL=170) being the crest at elevation 172 m. At the maximum flood water level (MWL=171), the reservoir capacity rises to 110 Mm³ and its surface area increases to 436 ha. Construction began in April 2011, and the experimental and commercial operation of the powerhouse started in March 2017 and April 2018, respectively. The first filling of the reservoir took place between June 2016 and June 2017. After a brief presentation of the project, the monitoring system is introduced and the evolution of the reservoir level during the first filling, including the indication of the filling stages, is described. The evolution of the displacements and of the hydraulic behaviour of the foundation since the beginning of the filling is presented, noticing the perceived agreement between observations in redundant systems, as well as the good fitness of a nonlinear finite element model. Additionally, the paper presents the safety conditions evaluation of the structure during the first years of operation, regarding the main effects of the temperature variations and the hydrostatic pressure.pt_BR
dc.language.isoengpt_BR
dc.publisherThe International Journal of Hydropower & Damspt_BR
dc.rightsrestrictedAccesspt_BR
dc.subjectConcrete damspt_BR
dc.subjectStructural behaviourpt_BR
dc.subjectFirst fillingpt_BR
dc.titleThe behaviour of Foz Tua dam during the first filling of the reservoir and its first years of operationpt_BR
dc.typeworkingPaperpt_BR
dc.description.pages9ppt_BR
dc.identifier.localPorto, Portugalpt_BR
dc.description.sectorDBB/NOpt_BR
dc.identifier.conftitleHydro 2019pt_BR
dc.contributor.peer-reviewedNAOpt_BR
dc.contributor.academicresearchersNAOpt_BR
dc.contributor.arquivoNAOpt_BR
Appears in Collections:DBB/NO - Comunicações a congressos e artigos de revista

Files in This Item:
There are no files associated with this item.


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.